|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | | |
| <div class=methodpage-infos> | | <div class=methodpage-infos> |
− | <hr style="border:0; border-bottom: 1px dashed #d21e3d; width: 100%;"> | + | <hr class=simpleline> |
| [[File:Time-icon.png | 20px | Time]] 60 min | | [[File:Time-icon.png | 20px | Time]] 60 min |
| + | |
| + | [[File:Material-icon.png | 20px | Material ]] Scissors. Set of few materials (piece of paper, maker, rope, etc) for each team. |
| | | |
| [[File:Group-size.png | 20px | Group Size ]] 20-30 people | | [[File:Group-size.png | 20px | Group Size ]] 20-30 people |
| | | |
| [[File:Keywords.png | 20px | Keywords ]] teambuilding, trust, group, experience based | | [[File:Keywords.png | 20px | Keywords ]] teambuilding, trust, group, experience based |
| + | <hr class=simpleline> |
| ===From:=== | | ===From:=== |
− | [[File:Ecovisio.jpg | EcoVisio | 120px | link=http://www.ecovisio.org/ | center]] | + | [[File:Ecovisio.jpg | EcoVisio | link=https://www.ecovisio.org/ | center]] |
− | <hr style="border:0; border-bottom: 1px dashed #d21e3d; width: 100%;"> | + | <hr class=simpleline> |
| + | |
| ===Related:=== | | ===Related:=== |
| *[[First Steps]] | | *[[First Steps]] |
Line 21: |
Line 25: |
| Participants start a team process by learning about each other. | | Participants start a team process by learning about each other. |
| They start an exchange about their needs in teamwork. | | They start an exchange about their needs in teamwork. |
− |
| |
− | ==In short==
| |
− | * Duration: 1 hour
| |
− | * Group size (min.- max.): 20-30
| |
− | * Material: Scissors. Set of few materials (piece of paper, maker, rope, etc) for each team.
| |
| | | |
| ==How to do it== | | ==How to do it== |
Line 47: |
Line 46: |
| exercise. To show the importance of the deadline possible not to accept the work of the group after deadline. | | exercise. To show the importance of the deadline possible not to accept the work of the group after deadline. |
| | | |
− | ==Source== | + | <hr class=boldline> |
− | http://activeco-program.org
| + | <noinclude>{{:Block: Author Ecovisio}}</noinclude> |
| + | |
| __NOTOC__ | | __NOTOC__ |
| + | [[Category:Method]] |
A creative challenge for teams
60 min
Scissors. Set of few materials (piece of paper, maker, rope, etc) for each team.
20-30 people
teambuilding, trust, group, experience based
From:
Related:
Aim
Participants start a team process by learning about each other.
They start an exchange about their needs in teamwork.
How to do it
All participants are split into 2 or 3 groups. Each group gets the same set of materials and instruments.
All get the same task: Each team should create an animal using the materials they get and can find
outside. An animal should have: a name, a story, four legs, should stay in the room without
being held, should be nice, creative, etc…
After all participants understood the task they have 40 minutes to fulfill the task. After deadline the teams present their animals.
Debriefing
- How was the work?
- What is important for teamwork?
- What did you feel?
- What roles were there in the team?
- Resources? Deadline? Leadership? Challenges?
Experience
The task could include more components such as: animal must be at least 1 meter high, etc. To make the task more challenging fewer or no instruments should be given to each team at the beginning of the
exercise. To show the importance of the deadline possible not to accept the work of the group after deadline.
Ecovisio
Non-governmental organisation and facilitators network from Moldova for sustainable development, Education for Sustainable Development and environmental learning.